Orthotic & Prosthetic Technologies

Scroll down videos in color coordinated folders

Coyote Design Air-Lock

Coyote Connectors

Boise Bi-Valve AFO

Coyote Design Easy-Off Lock

Coyote Composite

Not Airtight vs Airtight

Coyote Design Proximal Lock

Coyote Design Dynamic Strut AFO

COYOTE PRODUCT INFORMATION

Coyote Design Dynamic Strut AFO

Coyote Design Dynamic Strut AFO

Coyote Design Products

COYOTE TESTIMONIAL VIDEOS

VERY IMPORTANT when using Surlyn make sure to use an epoxy resin only. Rough up the Surlyn and EasyOff lock as in the videos.

Let the resin cure over night or to be safe cure for 24 hours.

Elevated Vacuum Socket with Surlyn

Easy Off Lock using Surlyn -Step1- Preparing Cast

Easy Off Lock using Surlyn -Step4- Finishing Socket & Final Evaluation

Easy Off Lock using Surlyn -Step2-

Seal Preparation

Easy Off Lock using Surlyn -Step3-

Alignment Transfer & Lamination

Fabrication of EasyOff Lock Socket

Fabrication of Air-Lock Socket

Thorough video of entire Air-Lock fabrication process.

Air-Lock & Easy Off Lock -Step 3- Transferring Alignment CD103

Air-Lock & Easy Off Lock -Step1- Installing Lock On Mold

 Air-Lock & Easy Off Lock -Step 4-

Layup CD103 and CD117 Easy Off Lock

Air-Lock & Easy Off Lock -Step 2-

Drape Molding Check Socket Fabrication Instructions

Air-Lock and Easy-Off Lock -Step 5- Finish

Other AirLock & EasyOff Lock Videos

Sealing leaky prosthetic socket

Blister forming Air-Lock test socket without connector

CD103P8 Pin Adjustment

Modifying Air-Lock for long pin

CD103FD Flexible Inner Socket with and without Coyote Design Fabrication Dummy

Blister forming Air-Lock test socket

with connector

CD103 Air Lock Assembly & Quality Check

Locking Lanyard Pin and 5 Degree Connector.

CD117 Easy-Off™ - Preparation For Test Socket

Salvaging Coyote Design Lock Parts

Air-Lock & Easy Off Instructions

COYOTE INSTRUCTIONAL VIDEOS

CD116 Proximal Lock Flexible Inner Socket

CD116 Using Sock with Proximal Lock

CD116 Proximal Lock creating form for liner

CD116 Proximal Lock attaching Liner Attachment

Proximal Lock Instructions

CQL Valve Installation gfx

CD301 Extractor Instructions

LowPro Summit Lock Socket Fabrication

CD120 Lanyard Plastic Puck - Coyote Design's Lanyard Plastic Puck Copoly Test Socket

CD309 Modification Handle Fab

CD301 Extractor Coyote Design

CD101 Summit Lock Socket Fabrication

CD120 Lanyard Plastic Puck - Coyote Design's Lanyard Plastic Puck Vivak Test Socket

Plaster casting a prosthetic device

LowPro Summit Socket Fabrication

with Flexible Inner Socket

Summit and LowPro Liner Attachment

Installation video of Coyote Design's Wave Suction Band (CD130B - S, M, L, X) Small, Medium, Large and Extra Large.

Other Coyote Instructions

For United States product sales please contact one of these distributors.

United Kingdom

Spain

Netherlands

France

Australia & New Zealand

Kanae

Orthopedic Services

Canada

Japan

Germany

Norway

INTERNATIONAL

for all countries not listed

For international product sales please contact one of these distributors.